Abu Dhabi, Dubai & Al Ain, UAE
Al Ain Distribution Substations Replacement
Distribution Infrastructure

Al Ain Distribution Substations Replacement

Supply, installation and replacement of aging & unreliable distribution substations with modern equipment across Al Ain.

2019-2021
Al Ain Region, UAE
Client: Al Ain Distribution Company
Project Overview

Modernizing Critical Infrastructure

ACECO was awarded a strategic contract by Al Ain Distribution Company (AADC) to undertake the comprehensive replacement of aging and unreliable distribution substations across the Al Ain region. This critical infrastructure upgrade was essential to enhance network reliability, reduce maintenance costs, and support the growing power demands of the expanding city.

The project involved the replacement of outdated equipment with modern, high-efficiency substations featuring advanced monitoring and protection capabilities. The scope included both package substations and ring main units (RMUs) across urban and rural areas of Al Ain.

Network Reliability

Replacing aging infrastructure to significantly reduce outages and improve service quality.

Technological Advancement

Integration of smart grid capabilities and remote monitoring systems for improved network management.

Minimal Disruption

Carefully planned replacement strategy ensuring continuous power supply during transitions.

Modern distribution substation in Al Ain
Project Details

Scope of Work

Comprehensive services provided for this critical infrastructure modernization project.

1

Assessment & Planning

  • Comprehensive condition assessment of existing substations
  • Prioritization of replacements based on condition and criticality
  • Development of detailed replacement schedules and methodologies
  • Coordination with AADC operations to minimize service disruptions
  • Detailed site surveys for civil works and equipment installation
2

Equipment Supply & Installation

  • Supply of modern package substations with SF6 insulated switchgear
  • Installation of new Ring Main Units (RMUs) with enhanced protection
  • Replacement of oil-type transformers with dry-type or low-loss units
  • Implementation of modern protection and control systems
  • Integration with SCADA and distribution management systems
3

Commissioning & Handover

  • Comprehensive testing of all installed equipment
  • Phased energization and load transfer to new equipment
  • Operational training for AADC staff on new equipment
  • Detailed documentation and as-built drawings
  • Extended warranty and maintenance support provisions

Project Statistics

75+

Substations Replaced

100+

Ring Main Units

2 Years

Project Duration

35%

Energy Efficiency Improvement

Explore More Projects

Discover our other electrical distribution projects across the UAE

Abu Dhabi Underground Cables & Equipment
distribution

Abu Dhabi Underground Cables & Equipment

View Details
Al Ain Cable & Equipment Installation
distribution

Al Ain Cable & Equipment Installation

View Details
Al Khazna Grid Busbar Protection System
substation

Al Khazna Grid Busbar Protection System

View Details