Project Overview
Contract No. N7204 involved the comprehensive design, supply, installation, testing, and commissioning of HVAC systems for multiple 132/33kV and 132/22kV substations including Mashtel Palace, E03, E25, Presidential Palace, and Al Falah Development.
This critical infrastructure project required precise load calculations, equipment selection, and coordination with multiple disciplines to ensure optimal performance and reliability of the electrical substations' climate control systems.
Scope of Work
Load Calculations & Equipment Selection
Comprehensive load calculations and coordination with other disciplines
Equipment Supply
Supply of all required HVAC equipment, materials, and control systems
Installation & Commissioning
Complete installation of ductwork, HVAC units, and control systems
Maintenance Services
Two-year maintenance of HVAC systems from PAC
Project Information
Client
TRANSCO (TAQA Transmission)/ETA
Year of Completion
2012
Location
Mashtel Palace, E03, E25, Presidential Palace & Al Falah Development
Key Features
- • Multiple substation locations
- • 132/33kV and 132/22kV systems
- • Complete design-build approach
- • Advanced control systems
- • Long-term maintenance included